4/10 Médiocre
Corinne K.
23 juin 2025
Construction Headache
Immediately upon arrival after a very long and hot travel day, we were greeted with the sound of drilling and excessively loud hammering. It was then we noticed the sign posted in the courtyard that there was “exceptional”construction happening on level three and four of the building, this unit is on level two. The unit under construction sits directly above. The noise started at 8 AM and did not let up until after five. It wasn’t light banging or a few moving things. It was excessive drilling into walls and hammering. Contacted VBRO and the property manager none were willing to offer any kind of concessions. We paid a ton for a headache. If you can find a different place to stay in Milan, I would highly recommend it. The location of this apartment is great, but the unit itself is a little tired and the construction is a dealbreaker.
Corinne K.
Séjour de 3 nuits en juin 2025